Engineering Construction Activity, Australia

This is not the latest release View the latest release

Contains value of engineering construction work done, commenced and yet to be done

Reference period
March 2024
Released
26/06/2024

Key statistics

In the March quarter:

  • Seasonally adjusted work done fell 2.3%.
  • Seasonally adjusted work done for the private sector fell 2.2%.
  • Value of work commenced fell 14.0% in original terms.
  • Trend work done rose 0.9%.

Value of work done

 

Value of work done, chain volume measures, seasonally adjusted estimate (a)
 Mar qtr 24 ($m)Dec qtr 23 to
Mar qtr 24 (%)
Mar qtr 23 to
Mar qtr 24 (%)
For the private sector16,732.8-2.25.1
For the public sector (b)14,091.9-2.48.4
Total engineering construction30,824.7-2.36.6
  1. Reference year for chain volume measures is 2021-22.
  2. Includes work done by the private sector for the public sector and work done by the public sector.

 

Value of work done, chain volume measures, trend estimate (a)
 Mar qtr 24 ($m)Dec qtr 23 to
Mar qtr 24 (%)
Mar qtr 23 to
Mar qtr 24 (%)
For the private sector16,905.30.26.8
For the public sector (b)14,362.61.712.7
Total engineering construction31,267.90.99.4
  1. Reference year for chain volume measures is 2021-22.
  2. Includes work done by the private sector for the public sector and work done by the public sector.

a. Reference year for chain volume measures is 2021-22.

a. Reference year for chain volume measures is 2021-22.

Value of work done, chain volume measures

Total

The seasonally adjusted estimate for the value of total engineering construction work done fell 2.3% in the March quarter to $30,824.7m. The trend estimate rose 0.9%. 

Private Sector

The seasonally adjusted estimate for the value of work done for the private sector fell 2.2% in the March quarter to $16,732.8m. The trend estimate rose 0.2%.

Public Sector

The seasonally adjusted estimate for the value of work done for the public sector fell 2.4% in the March quarter to $14,091.9m. The trend estimate rose 1.7%.

Value of work commenced

Total 

The value of work commenced fell 14.0% in the March quarter to $25,077.9m in original terms.

Private Sector

The value of work commenced for the private sector in the March quarter was $12,746.3m in original terms.

Public Sector

The value of work commenced for the public sector in the March quarter was $12,331.6m in original terms.

Data downloads

Time series spreadsheets

Data files
Data files

About this release

This publication updates the preliminary estimates released in Construction Work Done, Australia on 29 May 2024. This release includes revisions to Engineering Construction data back to December 2020.

Data notes

Several time series spreadsheets for recent quarters contain 'np' (not available for publication) annotations. This is due to confidential data being contained in these series.  

Mining projects tend to be complex in structure and comprise a number of different investment activities including exploration, engineering construction, plant and equipment and buildings. A feature article released in the March 2012 issue of Private New Capital Expenditure and Expected Expenditure, Australia provides a summary of the conceptual basis of the relevant ABS publications that measure investment in Australia, using a hypothetical mining project to illustrate how this investment is reflected in ABS data.

Enquiries

For enquiries about these and related statistics, contact the Customer Assistance Service via the ABS website Contact Us page. The ABS Privacy Policy outlines how the ABS will handle any personal information that you provide to us.

Article archive

Previous catalogue number

This release previously used catalogue number 8762.0

Methodology

Scope

All engineering construction work undertaken in Australia.

Excludes construction of buildings such as houses and offices.

Geography

Data available for:

  • Australia
  • States and territories.

Source

Engineering Construction Survey

Collection method

Data is collected from primary contractors (not subcontractors) of projects.

A sample of 2500-3000 businesses that are likely to conduct engineering construction activities are selected from the ABS business register each quarter.

History of changes

The trend series for Engineering Construction was reinstated in the September quarter 2022.

View full methodology
Back to top of the page