In the December quarter:

  • Seasonally adjusted work done fell 1.8%.
  • Seasonally adjusted work done for the private sector rose 0.3%.
  • Value of work commenced increased 18.0% in original terms.
  • Trend work done increased 0.4%.

Value of work done

 

Value of work done, chain volume measures, seasonally adjusted estimate (a)
 Dec qtr 25 ($m)Sep qtr 25 to
Dec qtr 25 (%)
Dec qtr 24 to
Dec qtr 25 (%)
For the private sector19,628.20.31.3
For the public sector (b)16,179.9-4.2-7.9
Total engineering construction35,808.1-1.8-3.0
  1. Reference year for chain volume measures is 2023-24.
  2. Includes work done by the private sector for the public sector and work done by the public sector.

 

Value of work done, chain volume measures, trend estimate (a)
 Dec qtr 25 ($m)Sep qtr 25 to
Dec qtr 25 (%)
Dec qtr 24 to
Dec qtr 25 (%)
For the private sector19,559.30.91.4
For the public sector (b)16,388.1-0.2-4.9
Total engineering construction35,947.40.4-1.6
  1. Reference year for chain volume measures is 2023-24.
  2. Includes work done by the private sector for the public sector and work done by the public sector.

a. Reference year for chain volume measures is 2023-24.

a. Reference year for chain volume measures is 2023-24.

Value of work done, chain volume measures

Total

The seasonally adjusted estimate for the value of total engineering construction work done fell 1.8% in the December quarter to $35,808.1m. The trend estimate rose 0.4%. 

Private Sector

The seasonally adjusted estimate for the value of work done for the private sector rose 0.3% in the December quarter to $19,628.2m. The trend estimate rose 0.9%.

Public Sector

The seasonally adjusted estimate for the value of work done for the public sector fell 4.2% in the December quarter to $16,179.9m. The trend estimate fell 0.2%.

Value of work commenced

Total 

The value of work commenced rose 18.0% in the December quarter to $33,072.1m in original terms.

Private Sector

The value of work commenced for the private sector in the December quarter was $21,188.8m in original terms.

Public Sector

The value of work commenced for the public sector in the December quarter was $11,883.3m in original terms.

Data downloads

Time series spreadsheets

Data files
Data files

About this release

This publication updates the preliminary estimates released in Construction Work Done, Australia on 25 Feb 2026. This release includes revisions to Engineering Construction data back to September 2025.

Enquiries

For enquiries about these and related statistics, contact the Customer Assistance Service via the ABS website Contact Us page. The ABS Privacy Policy outlines how the ABS will handle any personal information that you provide to us.

Article archive

Previous catalogue number

This release previously used catalogue number 8762.0

Methodology

Scope

All engineering construction work undertaken in Australia.

Excludes construction of buildings such as houses and offices.

Geography

Data available for:

  • Australia
  • States and territories.

Source

Engineering Construction Survey

Collection method

Data is collected from primary contractors (not subcontractors) of projects.

A sample of 2500-3000 businesses that are likely to conduct engineering construction activities are selected from the ABS business register each quarter.

History of changes

The trend series for Engineering Construction was reinstated in the September quarter 2022.

View full methodology
Back to top of the page