Mar qtr 25 ($m) | Dec qtr 24 to Mar qtr 25 (%) | Mar qtr 24 to Mar qtr 25 (%) | |
---|---|---|---|
Building | 39,069.1 | 0.9 | 2.6 |
Residential | 24,274.6 | 1.6 | 7.0 |
Non-residential | 14,794.5 | -0.1 | -3.9 |
Engineering | 35,361.1 | -1.0 | 4.5 |
Total construction | 74,430.2 | 0.0 | 3.5 |
- Reference year for Chain Volume Measures is 2022-23.
Mar qtr 25 ($m) | Dec qtr 24 to Mar qtr 25 (%) | Mar qtr 24 to Mar qtr 25 (%) | |
---|---|---|---|
Building | 39,002.0 | 0.5 | 1.7 |
Residential | 24,284.3 | 1.7 | 7.0 |
Non-residential | 14,732.1 | -1.3 | -5.8 |
Engineering | 35,691.9 | 0.8 | 4.8 |
Total construction | 74,722.7 | 0.7 | 3.2 |
- Reference year for Chain Volume Measures is 2022-23.
a. Reference year for Chain Volume Measures is 2022-23.
The value of total construction work done remained steady at $74,430.2m in the March quarter, in seasonally adjusted terms. Building work done rose 0.9% in the March quarter and is 2.6% higher than the same time last year. Engineering work fell 1.0% and is 4.5% higher than the same time last year.
The trend estimate for total construction work done rose 0.7% in the March quarter.
An article Value of renewable energy construction was released on 18 December 2024, providing insights into the level of renewable investment in the electricity generation, transmission and distribution sector from the March quarter 2016 to the June quarter 2024.
a. Reference year for Chain Volume Measures is 2022-23.
The value of building work rose 0.9% in the March quarter, in seasonally adjusted terms. The increase was driven by a rise in residential building work, which increased 1.6% in the March quarter and is 7.0% higher than at the same time last year. Non-residential building work fell 0.1% in the March quarter and is 3.9% lower than at the same time last year.
The trend estimate for total building work done rose 0.5% in the March quarter.
An article Home building through the pandemic was released on 19 November 2024, providing insights into home building conditions from 2019-2024.
State/Territory | Mar qtr 25 ($m) | Dec qtr 24 to Mar qtr 25 (%) | Mar qtr 24 to Mar qtr 25 (%) |
---|---|---|---|
New South Wales | 21,224.2 | -1.3 | 1.8 |
Victoria | 18,361.3 | -1.1 | 0.6 |
Queensland | 14,915.0 | 1.5 | 4.9 |
South Australia | 4,587.3 | 6.7 | 7.7 |
Western Australia | 12,330.3 | 2.0 | 10.2 |
Tasmania | 1,072.6 | -4.3 | -6.6 |
Northern Territory | 820.0 | -21.6 | 0.1 |
Australian Capital Territory | 969.2 | -2.0 | -10.6 |
- Reference year for Chain Volume Measures is 2022-23.
Total construction work done rose in Queensland, South Australia and Western Australia whilst total construction work done fell in all other states and territories.