5625.0 - Private New Capital Expenditure and Expected Expenditure, Australia, Sep 2012 Quality Declaration
ARCHIVED ISSUE Released at 11:30 AM (CANBERRA TIME) 29/11/2012
Page tools: Print Page Print All | ||
|
ACTUAL AND EXPECTED NEW CAPITAL EXPENDITURE TOTAL CAPITAL EXPENDITURE Estimate 4 for total capital expenditure for 2012-13 is $173,350 million. This is 4.9% higher than Estimate 4 for 2011-12. The main contributor to this increase was Mining (17.1%). Estimate 4 is 3.3% lower than Estimate 3 for 2012-13. The main contributor to this decrease was Mining (-8.1%). BUILDINGS AND STRUCTURES Estimate 4 for buildings and structures for 2012-13 is $119,734 million. This is 10.9% higher than Estimate 4 for 2011-12. The main contributor to this increase was Mining (22.1%). Estimate 4 for buildings and structures is 5.3% lower than Estimate 3 for 2012-13. The main contributor to this decrease was Mining (-7.7%). EQUIPMENT, PLANT AND MACHINERY Estimate 4 for equipment, plant and machinery for 2012-13 is $53,617 million. This is 6.2% lower than Estimate 4 for 2011-12. The main contributor to this decrease was Other Selected Industries (-6.0%). Estimate 4 for equipment, plant and machinery is 1.5% higher than Estimate 3 for 2012-13. The main contributor to this increase was Other Selected Industries (9.4%). MINING Estimate 4 for Mining for 2012-13 is $109,353 million. This is 17.1% higher than the corresponding estimate for 2011-12. Estimate 4 is 8.1% lower than Estimate 3 for 2012-13. Buildings and structures is 7.7% lower and equipment, plant and machinery is 10.4% lower than the corresponding third estimates for 2012-13. MANUFACTURING Estimate 4 for Manufacturing for 2012-13 is $11,366 million. This is 17.7% lower than the corresponding estimate for 2011-12. Estimate 4 is 0.4% lower than Estimate 3 for 2012-13. Buildings and structures is 3.1% lower while equipment, plant and machinery is 1.3% higher than the corresponding third estimates for 2012-13. OTHER SELECTED INDUSTRIES Estimate 4 for Other Selected Industries for 2012-13 is $52,632 million. This is 9.2% lower than the corresponding estimate for 2011-12. Estimate 4 is 7.7% higher than Estimate 3 for 2012-13. Buildings and structures is 5.4% higher and equipment, plant and machinery is 9.4% higher than the corresponding third estimates for 2012-13. Document Selection These documents will be presented in a new window.
|