ACTUAL AND EXPECTED NEW CAPITAL EXPENDITURE TOTAL CAPITAL EXPENDITURE Estimate 5 for total capital expenditure in 2015-16 is $123,956m. This is 17.8% lower than Estimate 5 for 2014-15. The main contributor to this decrease is Mining (-29.7%). Estimate 5 is 0.6% lower than Estimate 4 for 2015-16. The main contributor to this decrease is Mining (-5.6%). Estimate 1 for total capital expenditure for 2016-17 is $82,572m. This is 19.5% lower than Estimate 1 for 2015-16. The main contributor to the decrease was Mining (-36.2%). BUILDINGS AND STRUCTURES Estimate 5 for buildings and structures in 2015-16 is $78,747m. This is 22.4% lower than Estimate 5 for 2014-15. The main contributor to this decrease is Mining (-29.7%). Estimate 5 for buildings and structures is 3.4% lower than Estimate 4 for 2015-16. The main contributor to this decrease is Mining (-5.7%). Estimate 1 for buildings and structures for 2016-17 is $49,372m. This is 28.5% lower than Estimate 1 for 2015-16. The main contributor to the decrease was Mining (-38.9%). EQUIPMENT, PLANT AND MACHINERY Estimate 5 for equipment, plant and machinery for 2015-16 is $45,210m. This is 8.2% lower than Estimate 5 for 2014-15. The main contributor to this decrease is Mining (-29.4%). Estimate 5 is 4.6% higher than Estimate 4 for 2015-16. The main contributor to this increase is Other Selected Industries (7.0%). Estimate 1 for equipment, plant and machinery for 2016-17 is $33,200m. This is 0.8% lower than Estimate 1 for 2015-16. The main contributor to the decrease was Mining (-20.5%). MINING Estimate 5 for Mining for 2015-16 is $56,765m. This is 29.7% lower than Estimate 5 for 2014-15. Estimate 5 is 5.6% lower than Estimate 4 for 2015-16. Buildings and structures is 5.7% lower and equipment, plant and machinery is 4.6% lower than the corresponding fourth estimates for 2015-16. Estimate 1 for Mining for 2016-17 is $34,351m. This is 36.2% lower than Estimate 1 for 2015-16. Buildings and structures is 38.9% lower and equipment, plant and machinery is 20.5% lower than the corresponding first estimate for 2015-16. MANUFACTURING Estimate 5 for Manufacturing for 2015-16 is $8,285m. This is 2.2% lower than Estimate 5 for 2014-15. Estimate 5 is 1.0% higher than Estimate 4 for 2015-16. Buildings and structures is 6.2% lower and equipment, plant and machinery is 3.4% higher than the corresponding fourth estimate for 2015-16. Estimate 1 for Manufacturing for 2016-17 is $6,580m. This is 9.3% higher than Estimate 1 for 2015-16. Buildings and structures is 1.0% lower and equipment, plant and machinery is 13.5% higher than the corresponding first estimate for 2015-16. OTHER SELECTED INDUSTRIES Estimate 5 for Other Selected Industries for 2015-16 is $58,906m. This is 4.3% lower than Estimate 5 for 2014-15. Estimate 5 is 4.4% higher than Estimate 4 for 2015-16. Equipment, plant and machinery is 7.0% higher while buildings and structures is 1.5% higher than the corresponding fourth estimates for 2015-16. Estimate 1 for Other Selected Industries for 2016-17 is $41,641m. This is 2.5% lower than Estimate 1 for 2015-16. Buildings and structures is 8.7% lower and equipment, plant and machinery is 3.6% higher than the corresponding first estimate for 2015-16. Document Selection These documents will be presented in a new window.
|