ENGINEERING CONSTRUCTION ACTIVITY
For Victoria, the total value of engineering work done during March quarter 2008 was $1,716.7m, a decrease of 2.5% from December quarter 2007. The overall decrease in March quarter 2008 was mainly due to a decrease in the value of work done for Roads, highways and subdivisions ($99.6m).
In contrast, the value of work done increased for Electricity generation, transmission etc. and pipelines ($24.0m), Recreation and other ($16.6m), Bridges, railways and harbours ($10.5m), Telecommunications ($6.2m) and Heavy industry ($0.7m).
ENGINEERING CONSTRUCTION ACTIVITY, Value of Work Done
View underlying table as an Excel spreadsheet: 1367.2
Engineering Construction Activity, By Type, Victoria: Original (file size 42kB).