ENGINEERING CONSTRUCTION ACTIVITY
For Victoria, the total value of engineering construction activity (work) done during September quarter 2008 was $2,013.5m, an increase of 4.7% from June quarter 2008. The overall increase in September quarter 2008 was mainly due to increases in the value of work done for Electricity generation, transmission etc. and pipelines ($109.6m), Water storage and supply, sewerage and drainage ($95.6m), Bridges, railways and harbours ($30.4m) and Heavy Industry ($27.1m). The value of work done decreased for Telecommunications (-$91.4m), Roads, highways and subdivisions (-$67.0m) and Recreation and other (-$15.0m).
ENGINEERING CONSTRUCTION ACTIVITY, Value of Work Done, Victoria
![](/AUSSTATS/abs@.nsf/7d12b0f6763c78caca257061001cc588/3f6cc6eb634dafdaca2575620013f08d/Body/0.564!OpenElement&FieldElemFormat=gif)
View underlying table as an Excel spreadsheet: 1367.2
Engineering Construction Activity, By Type, Victoria: Original (file size 67kB).