8301.0 - Production of Selected Construction Materials, Nov 2012  
Previous ISSUE Released at 11:30 AM (CANBERRA TIME) 21/12/2012   
   Page tools: Print Print Page Print all pages in this productPrint All RSS Feed RSS Bookmark and Share Search this Product

This document was added 01/09/2013.

09/01/2013 In the November release the Explanatory Notes refer to a change in the series level due to coverage changes as a result of ASGS implementation. Point 5 states that this change was approximately 3.5%. This number should have been 5.5%. No other figures have been changed.